top of page

IKC DE POEL

GELEVERD

BOUWHEER

Gemeente Nieuwkoop

BOUWPLAATS

LANGERAAR (NL)

OPDRACHTGEVER

Vink Bouw

ARCHITECT

DAT

BOUWJAAR

2024

Design, engineering en de aanlevering van CLT voor de ontwikkeling van een Integraal Kindcentrum (IKC) en duurzaam wooncomplex.

IKC De Poel - Vink Bouw

Sustainability

wood-pile_39442.png

-

CLT / wood products

pine-tree-icon-png-3-transparent_edited_

288.63 tons

Trees have been used for this project

-

42.01 tons

CO² emissions during production & transport

pine-tree-icon-png-3-transparent_edited_

3 minutes

-

Number of trees used for regrowth in sustainably managed Austrian forests

co2-icon-5_edited_edited_edited.png

288.63 tons

-

CO² captured in used trees

-

24 days

Construction time with 4 people